Awaiting feedback Import finalyzed, but messages in Admin

Abraham54

Well-known member
Licensed customer
Affected version
Importer 1.6.4
I haave in Admin still messages about the import.
I used Importer 1.6.4

Import already finalyzed.webp

I think it is a bug.

If i cllik manual rebuild the messages, which are already complete rebuild during finalizing and then manually rebuilding the caches, are rebuilded partly and each time the rebuilding starts at the point where the former rebuild had stopped.
 
Automated triage: Awaiting feedback

Thank you for reporting this issue. We found no fault in the code yet. The import notice stays until the import is completed on the import complete page. The other notice means a rebuild job is still queued and resumes from where it last stopped. We need a little more detail to look into this.

  • After finalizing, did you reach the 'Import complete' page and click the 'Complete import' button? If you finalized from the command line, did you answer 'y' to the question about completing the import?
  • When you click 'Continue running them', what makes the rebuild stop partway: do you see an error message, does the page time out, or do you leave the page before it finishes?
  • Which jobs does the run page show as running (the status text), and are there any entries in Admin control panel > Logs > Server error log from that time?

This is an automated assessment. A member of staff may review and update it.
 
Back
Top Bottom